Connecticut · Code adoption

Connecticut adopted codes

Statewide-mandatory (Office of the State Building Inspector). A newer 2026-cycle code is drafted but delayed pending legislative review — do not assume it's live yet.

Adopted NEC

NEC 2020 + CT amendments

Energy code

2021 IECC + CT amendments

Last verified

2026-07-03 · verified

Solar PV, storage & EV

Governing articles
690 / 705 / 706 (PV, interconnection, storage) · 625 (EV supply equipment)
Enforced through
NEC 2020 + CT amendments

Connecticut — Code Adoption Summary

Adoption model: Statewide-mandatory (Office of the State Building Inspector). A newer 2026-cycle code is drafted but delayed pending legislative review — do not assume it's live yet. Last verified: 2026-07-03 Confidence: verified Primary sources: CT OSBI — https://portal.ct.gov/das/office-of-state-building-inspector · ICC CT

Statewide adopted codes — current (2026) — 2022 CT State Building Code

Code familyAdopted editionNotesSource
Building2022 CT SBC (2021 IBC/IRC base)applies to applications made after 2022-10-01portal.ct.gov
Residential / Existing / Mechanical / Plumbing / Pool-Spa2021 IRC/IEBC/IMC/IPC/ISPSC + CT amendments"
Energy2021 IECC + CT amendments"
Electrical (NEC)NEC 2020 + CT amendments"
AccessibilityICC A117.1-2017"

Pipeline: the next CT code cycle (2024 ICC-family models) was expected effective 2026-07-01, but is awaiting Legislative Regulation Review Committee approval and may be delayed — confirm current status before assuming the new cycle is live.

Adoption model & precedence

  • The state code is mandatory statewide; local building officials enforce it, with CT amendments layered on the base I-Codes.
  • AHJ = local building official.

Major cities / counties

JurisdictionNotesBuilding dept.
Bridgeport / New Haven / Hartford / Stamfordstatewide code (no significant home-rule carve-outs identified)respective building depts

AHJ fallback (when local adoption is unverified)

  • State baseline (certain, as of 2026-07): 2022 CT SBC (2021 IBC/IRC), NEC 2020, IECC 2021.
  • Action: confirm whether the delayed 2026-cycle code (2024 ICC family) has taken effect yet — status was pending legislative approval as of this writing.

Change log

  • 2026-07-03 — created; verified 2022 CT SBC (2021 IBC, NEC 2020, IECC 2021); flagged next-cycle (2024 ICC family) delay pending legislative review.

Adoption dates move. Confirm the governing edition with the AHJ before issuing for permit — this entry was last checked on 2026-07-03.