Montana · Code adoption

Montana adopted codes

Statewide-mandatory via Administrative Rules of Montana (ARM) Title 24, Chapter 301 — the state amendment text (not the raw model code) IS the legally binding "Montana Building Code."

Adopted NEC

NEC 2023

Energy code

IECC 2021 + MT amendments

Last verified

2026-07-03 · verified

Solar PV, storage & EV

Governing articles
690 / 705 / 706 (PV, interconnection, storage) · 625 (EV supply equipment)
Enforced through
NEC 2023

Montana — Code Adoption Summary

Adoption model: Statewide-mandatory via Administrative Rules of Montana (ARM) Title 24, Chapter 301 — the state amendment text (not the raw model code) IS the legally binding "Montana Building Code." Last verified: 2026-07-03 Confidence: verified Primary sources: MT Dept. of Labor & Industry, Building & Safety Div. — https://bsd.dli.mt.gov/building-codes-permits/current-codes · ICC MT

Statewide adopted codes — current (2026)

Code familyAdopted editionEffectiveSource
Building / Residential / Existing / Mechanical / Fuel Gas2021 IBC/IRC/IEBC/IMC/IFGC (+ 2021 IWUIC wildland-urban interface)2023-03-11bsd.dli.mt.gov
Electrical (NEC)NEC 20232023-09-23meltplan.com
PlumbingUPC 2021Montana = UPCbsd.dli.mt.gov
EnergyIECC 2021 + MT amendments2023-03-11"

Pipeline: Montana plans to adopt the 2024 ICC family mid-2026 — check whether this has landed by the permit date. Structural note: Montana amendments/deletions/additions via ARM Title 24, Ch. 301 supersede the model-code text — always consult the ARM alongside the base IBC/IRC, not the base code alone.

Adoption model & precedence

  • Codes are statewide-mandatory; the ARM amendment set is legally controlling where it conflicts with the base model code.
  • AHJ = local building department, applying the statewide edition + ARM amendments.

Major cities / counties

JurisdictionCountyNotesBuilding dept.
BillingsYellowstonestatewide codebillingsmt.gov
MissoulaMissoulastatewide codeci.missoula.mt.us
BozemanGallatinstatewide code; publishes adopted-codes pagebozemanmt.gov

AHJ fallback (when local adoption is unverified)

  • State baseline (certain): 2021 IBC/IRC/IMC/IFGC, NEC 2023 (eff. 2023-09-23), UPC 2021, IECC 2021 + MT amendments.
  • Action: confirm whether the 2024 ICC family (planned mid-2026 adoption) has taken effect for the permit date.

Change log

  • 2026-07-03 — created; verified NEC 2023 (eff. 2023-09-23), 2021 I-Codes (eff. 2023-03-11), UPC 2021; flagged planned mid-2026 adoption of 2024 ICC family and ARM Title 24 Ch.301 as the controlling amendment structure.

Adoption dates move. Confirm the governing edition with the AHJ before issuing for permit — this entry was last checked on 2026-07-03.