South Carolina · Code adoption

South Carolina adopted codes

Statewide-mandatory (SC Building Codes Council, LLR). 2024 code cycle in active modification process as of mid-2026.

Adopted NEC

NEC 2023 (current)

Energy code

IECC 2021, adopted 2023

Last verified

2026-07-03 · verified

Solar PV, storage & EV

Governing articles
690 / 705 / 706 (PV, interconnection, storage) · 625 (EV supply equipment)
Enforced through
NEC 2023 (current)

South Carolina — Code Adoption Summary

Adoption model: Statewide-mandatory (SC Building Codes Council, LLR). 2024 code cycle in active modification process as of mid-2026. Last verified: 2026-07-03 Confidence: verified Primary sources: SC LLR Building Codes Council — https://llr.sc.gov/BCC/codes.aspx · ICC SC

Statewide adopted codes — current (2026; 2021-cycle, 2024-cycle in progress)

Code familyAdopted editionNotesSource
Building2021 SC Building Code (2021 IBC, 1st printing Oct 2022)llr.sc.gov
Electrical (NEC)NEC 2023 (current)seed guess of 2017 was stale — correctedllr.sc.gov / codes basis
PlumbingIPC 2021SC = IPCllr.sc.gov
EnergyIECC 2021, adopted 2023(seed guess of 2009 was stale — corrected)llr.sc.gov

In progress: SC published Notice of Intent to modify/adopt 2024 codes (State Register, 2025-01-24), with 2024 Code Modifications published 2026-05-22 — the 2024 cycle is actively rolling out now. Confirm effective date before relying on 2021-cycle values for new permits.

Adoption model & precedence

  • Codes are statewide-mandatory; the Building Codes Council administers, locals enforce.
  • Local amendments are limited/more-stringent only.
  • AHJ = local building department, applying the current statewide edition.

Major cities / counties

JurisdictionCountyNotesBuilding dept.
ColumbiaRichlandstatewide codecolumbiasc.gov
CharlestonCharlestonstatewide code + coastal/wind provisionscharleston-sc.gov
GreenvilleGreenvillestatewide codegreenvillesc.gov

AHJ fallback (when local adoption is unverified)

  • State baseline (current): 2021 SC Building Code, NEC 2023, IPC 2021, IECC 2021.
  • Action: confirm whether the 2024 code cycle (in active rollout as of May 2026) has taken effect for the permit date.

Change log

  • 2026-07-03 — created; corrected stale seed guesses (was NEC~2017/IECC 2009) to verified NEC 2023 / IECC 2021 (2021 SC Building Code cycle); flagged active 2024-cycle rollout.

Adoption dates move. Confirm the governing edition with the AHJ before issuing for permit — this entry was last checked on 2026-07-03.